0
The Finish Line

The construction and repairs took all of 3 months to finish. Interiors and “finishing touches” to transform the building into a “flower school” was a lot more work than we expected – and took more than a month to complete.
The good news is that we got to be very specific about how we wanted the school to look. The even better news was that for the first time in several months we worked together on an almost daily basis and it was wonderful.
The staff has been hired two weeks ago. The faculty has met with the Board today. The blessing and ribbon-cutting is set. On May 28, our “baby” will see the light of day.
